Scope Of Works

Alltype Engineering was contracted by AGIG to complete workshop detailed design and supply, fabricate, NDT, trial assemble, hydrotest, surface treat, final assemble, complete E&I fit out and complete FAT activities of 12 off skid assemblies, before packaging and loading onto transport destined for the Tanami desert in the Northern Territory.


The skids were required on a fast tracked sequential basis to meet the timeline requirements of the site installation crews, which resulted in an accelerated and compressed time frame for the delivery. By working collaboratively with the client, Alltype Engineering secured a dedicated assembly and packaging facility, allowing multiple skid assembly and testing to occur simultaneously, safely and securely.

Project Description

Client:

Australian Gas and Infrastructure Group (AGIG)

Location:

Alice Springs, NT

Year:

2019

Scope of works:

SMPEI